• FGD SYSTEM
  • FLUE GAS PURIFICATION SYSTEM
  • CEMENT GRINDING STATION
  • CEMENT PRODUCTION LINE
  • ACTIVE LIME PRODUCTION LINE
  • LIME SLAKING PLANT
  • MAGNESIUM PRODUCTION LINE
  • MAGNESIUM OXIDE (MgO) PLANT
  • LITHIUM PRODUCTION LINE
  • GYPSUM POWDER PRODUCTION LINE
  • ALUMINUM ASH PROCESSING SYSTEM
  • LECA PRODUCTION LINE
  • FRACTURING PROPPANT PRODUCTION LINE
  • SOLID (HAZARDOUS) WASTE INCINERATION SYSTEM
  • PULVERIZED COAL PREPARATION PRODUCTION LINE
  • GGBS PRODUCTION LINE
  • SUPERPHOSPHATE PRODUCTION LINE
  • MOLECULAR SIEVE PRODUCTION LINE
  • SOIL REMEDIATION SYSTEM
  • Grinding Mills
  • Kilns & Dryers
  • Conveyors
  • Crushers
  • Bucket Elevators
  • Dust Collectors
  • Project details

    Project Name

    Ø​1.2x1.4m Ball Mill Project in Iran

    Capacity

    2-3t/h

    Location

    Iran

    Project Overview

    Signing date: 2015-12-06

    Processing material: ore

    Processing capacity: 2-3t/h

    Project overview:

    In December 2015, Iranian customers visited, inspected and compared many parties. After seeing our company's R&D and design capabilities, processing and manufacturing capabilities, etc., they highly recognized our company's comprehensive strength, and then signed a contract with our company for Ø1.2x1.4m ball mill, the cooperation between the two parties is very pleasant.

    Project Solution

    1) Before installation, the main components such as cylinder, gear, hollow shaft, reducer and other main components should be checked for quality. If there is any damage or deformation, it should be dealt with in advance.

    2) Before installation, the installed parts should be cleaned up. Parts with direction, such as step liner, screw cylinder, lifting plate, etc., must be installed according to the technical requirements, and must not be installed reversely.

    3) After the installation of the two main bearing chassis, the relative elevation must be checked, the error is less than 1.5 mm, and the feed end is not allowed to be lower than the discharge end. If the difference is 0.8 mm, their transverse centerlines must be parallel, and the tolerance for non-parallelism is 0.9 mm.

    4) The contact area of the large and small gears when meshing is not less than 60% along the tooth height and not less than 80% along the tooth width.

    5) When installing the lining plate, the gap between the lining plate and the lining plate is 5-10 mm. The bolts for fixing the lining plate should be carefully installed with sealing packing, washers, lock washers and nuts to prevent leakage of mineral powder and The liner is loose.

    Equipment Configuration

    Ball Mill