The project is located in Nanjing City, Jiangsu Province. It has a designed annual processing capacity of 200,000 tons of steel slag, and is committed to achieving the effective recycling and comprehensive utilization of steel slag. 

The project covers all the key links of the steel slag deep processing process, including: 

Scientific and reasonable process layout design 

Optimized configuration of core equipment such as rod mills, crushers, and magnetic separators Construction of civil engineering, ensuring that the production site meets the process requirements 

Customization of non-standard equipment to meet special operating conditions Supply of equipment, installation and commissioning, as well as system integration testing 

Through integrated implementation, the project has achieved an effective closed-loop from raw material input to resource output, providing a replicable and scalable system solution for the resource utilization of steel slag. 

ZK: Full-process construction, high-standard delivery 

Henan Zhengzhou Mining Machinery Co., Ltd., as the main contractor of this project, is responsible for equipment supply, process layout, non-standard component manufacturing and installation and commissioning, etc. 

As the contractor, ZK has always adhered to the principle of putting the customer at the center and following the standards to ensure the products and services provided.

Completely in line with the technical protocol requirements Meet the new national industry standards 

Effectively respond to all specific demands of the client

In terms of equipment quality, all components are manufactured using advanced and reliable processing and manufacturing technologies, ensuring high surface geometric accuracy and reasonable tolerance fits, which guarantees the long-term stable operation of the equipment. Especially in terms of national mandatory standards such as safety, occupational health, and energy conservation and environmental protection, ZK strictly adheres to them without any compromise, firmly holding onto the bottom line of project compliance and safety.