• Cement Solution
  • Lime Solution
  • Magnesium Solution
  • LECA Solution
  • Lithium Solution Phosphate Ore Disposal Solution
  • Others
  • Grinding Mills
  • Kilns & Dryers
  • Granulators
  • Conveyors
  • Crushers
  • Bucket Elevators
  • LIME REGENERATION PLANT

    CAPACITY: 50~1200TPD

    FUEL: coal gas, natural gas, and pulverized coal

    EQUIPMENT: lime rotary kiln, rotary dryer rotary cooler, jaw crusher, bucket elevator, separator, dust collector, etc.

    As a professional lime solution provide, ZK has developed an innovative and sustainable solution for producing high-quality lime by calcining industrial residues, specifically sugar/beet plant waste and papermaking white mud.

    Get A Quote Leave Message

    Send e-mail:vip@zkcorp.com Whatsapp : 8618037866379

    Introduction

    As a professional lime solution provide, ZK has developed an innovative and sustainable solution for producing high-quality lime by calcining industrial residues, specifically sugar/beet plant waste and papermaking white mud. Moving beyond traditional limestone-based production, this system embodies the principles of a circular economy by converting challenging waste streams—characterized by high moisture and viscosity—into valuable industrial products (lime and CO₂). The core design philosophy fully integrates energy conservation, environmental protection, and resource reuse. A successful reference plant is already operational in the UAE, validating the technology's commercial and technical feasibility.

    Advantages

    1. Waste to Resource: Transforms industrial residues into primary products (lime powder) and recoverable by-products (CO ).

    2. Energy Optimization: Implements a multi-stage heat recovery chain (flue gas for drying, cooled lime for pre-heating combustion air).

    3. Emission Control & Recycling: Features comprehensive gas treatment with dedicated collection of CO and lime dust for reuse within the associated industrial complex, minimizing waste and environmental impact.

    This integrated approach demonstrates an advanced and sustainable model for lime production within a modern industrial ecosystem.

    Technology

    1. Material Preparation & Drying: Sugar residue (30-40% moisture) is fed via a specialized box feeder to a metering belt conveyor. A shaftless screw conveyor, ideal for viscous materials, then transfers it to a rotary dryer. Here, a built-in chain device breaks up clumps to prevent wall adhesion and enhance heat exchange. Crucially, the dryer utilizes hot flue gas from the kiln tail, recovering waste heat.

    2. Calcination & Cooling: The dried material enters the rotary kiln, where a burner system maintains a calcination temperature of approximately 1250°C, ensuring complete conversion to lime (CaO). The hot lime discharges into a single-cylinder cooler. Ambient air cools the lime down to approximately ambient temperature +50°C, and this pre-heated air is then recycled as combustion support air back into the kiln, significantly improving thermal efficiency.

    3. Finishing & By-Product Recovery: The cooled lime is ground into powder in a ball mill. The flue gas treatment system is integral to the project's environmental and circular design: kiln exhaust first passes through a cyclone dust collector, then a heat exchanger, and finally a CO collection unit. The captured CO is intended for reuse in sugar production. Similarly, dust from the grinding system, collected by a wet scrubber, can be hydrated into lime for reuse in the sugar plant.

    Parameter

    Capacity (t/d)15020025030035040050060080010001200
    Main EquipmentMain supporting equipment models and technical and economic indicators
    Vertical PreheaterYRQ04YRQ06YRQ06YRQ08YRQ08YRQ10YRQ12YRQ12YRQ14YRQ18YRQ20
    Rotary Kilnφ2.5×40mφ2.8×43mφ3.0×48mφ3.2×50mφ3.3×52mφ3.6×55mφ3.8×58mφ4.0×60mφ4.3×65mφ4.9×70mφ5.1×72m
    Vertical CoolerLSF36LSF44LSF56LSF80LSF112
    Calcination Temperature /℃1100±50
    Energy Consumption Index /(kCal/kg)1200±100≤1150≤1100
    Power Consumption Index /(kW·h/t)40±5
    Limestone: Lime1.7~1.78:1
    Light and Over burnt Rate /%≤5
    Lime Activity /ml≥340(depends on the composition of limestone)
    Lime Discharging Temperature /℃Ambient Temperature +60
    Limestone Feeding Size /mm10~20/20~40
    Emission Concentration /(mg/Nm3)≤10
    Annual Working Day / Days≥340
    Overhaul Cycle / Year1~3
    Labor / Shift2~3
    Applicable fuelCoal powder, Coke oven gas, Semi-coke furnace gas, Converter gas, Blast furnace gas, Calcium carbide furnace gas, Natural gas, Diesel oil, Heavy oil, Liquefied petroleum gas, biomass fuel etc.

    Note: This configuration table is for reference only and varies according to project site conditions and customers requirements.

    Contact Us

    Please leave a message. Get answers next business day.

    Name *

    Email *

    Telephone

    Message *

    Send message & get quote